I've got some problems with overhead line building. Tensioning constantly breaks down, if succeed from one direction, the opposite wire anchoring never want work (wrong direction of tension parts, etc.). I apply it in the correct, reduced pylon spacing, okk/okd consoles.
There is a possibility for the subsequent preparation?
Maybe I need help, what is the correct order in the directions of the tensioning to prepare, how to lay to correct solution?
Otherwise, overhead line building method is easy and logical.
Dodano: 16 Czerwca 2016, 15:07:36
Here is the problem.
I can begin a wire-chain, but cannot close.
Dodano: 16 Czerwca 2016, 18:51:07
Lapsed, I discovered, how to.